The Trail At The Edge Of Circle C Is About To Stop Being A Dead End

The Trail At The Edge Of Circle C Is About To Stop Being A Dead End

Cross under MoPac from the Circle C Metropolitan Park side and the Violet Crown Trail does what it has always done here: it runs for a while through the escarpment, crosses Slaughter Creek, and then simply stops. Not literally stops, since the surface keeps going as a rougher connector trail, but the maintained, mapped section of the Violet Crown Trail ends and you either turn around or keep going on something that was never quite finished. For years, that has been the deal if you live in Circle C and use the trail regularly. It is a loop, not a route.

That is changing this year, and most of what gets written about this neighborhood does not mention it.

A 13-mile gap is finally closing

The Violet Crown Trail is not a Circle C amenity. It is a 30-mile regional trail that starts at Zilker Park and is meant to run all the way into Hays County, and Circle C has always sat in the middle of it rather than at either end. The first six miles, from Zilker to Brodie Lane at Highway 290, opened in August 2015. The next stretch, from 290 down to Slaughter Creek, was finished in February 2019. The 1.7-mile section that runs through Circle C Metropolitan Park itself, on both sides of MoPac, was completed in 2024, built as a 10-foot decomposed granite path wide enough for walkers, runners, and cyclists to share.

What was still missing was the final 13-mile piece: the segment that continues south from Circle C Park all the way into Hays County. Construction on that segment started in the fall of 2025, and the City of Austin's own trail page lists a summer 2026 completion target. A separate tracker of the project has put the opening closer to spring 2026. The two estimates do not agree, which is normal for a public infrastructure project running behind a moving construction schedule, but the direction is the same either way: this is the segment that finally turns Circle C's local trail loop into a through-route on the regional system.

Here is what that actually changes for someone who already lives here. Right now, a long run or ride out of Circle C means doubling back once you hit the rough section past Slaughter Creek. The existing trail already reaches the Lady Bird Johnson Wildflower Center by way of La Crosse Avenue. What the extension adds is everything past that point: 13 more miles continuing south into Hays County that do not currently exist as maintained trail. Once it opens, the same starting point near the park puts you on a continuous route that keeps going well beyond the Wildflower Center instead of ending there. The neighborhood does not get a new park. It gets removed from being an edge case on a map that has treated it as a stopping point for over a decade.

Segment Length Status
Zilker Park to Brodie Lane / Hwy 290 6 miles Open since August 2015
Hwy 290 to Slaughter Creek roughly 7 miles Completed February 2019
Circle C Metropolitan Park (both sides of MoPac) 1.7 miles Completed 2024
Circle C Park to Hays County 13 miles Under construction, targeted for 2026

If you have been treating the trailhead near the park as a there-and-back workout, this is the year that assumption stops being accurate.

The Wednesday morning that never needed a completion date

Not everything that defines daily life here is waiting on a construction crew. Every Wednesday at 9 a.m., a group of retired and semi-retired men in Circle C meets for breakfast at Waterloo, the restaurant at Escarpment and Slaughter. The group has been meeting for years, long before anyone was talking about trail extensions or MoPac parcels, and it runs on its own clock entirely separate from any HOA agenda or city project timeline.

It is a small detail, but it is the kind of detail that tells you something a trail map cannot. Circle C has enough tenure now that it has produced its own standing rituals, not just amenities. The golf course at Grey Rock Golf & Tennis Club, with its pro shop, clubhouse, grille, and tennis lessons, gets most of the attention when people describe the neighborhood's built-in recreation. The Wednesday table at Waterloo is the version of that same idea that nobody markets.

The restaurant corridor turns over faster than the trail does

If the trail system moves in decade-long increments, the dining options around Escarpment Village and Lantana Place move on a much shorter clock. A current look at what residents are actually eating near Circle C includes District Kitchen & Cocktails, Oasthouse, DeSano Pizzeria Napoletana, Jack Allen's Kitchen, and La Traviata Italian Kitchen, all clustered in the same commercial stretch that residents pass on the way to or from MoPac.

That list will look different in another year or two. It already looks different than it did five years ago. The one constant through all of it has been Circle C Café and Catering, the walk-up window at 5919 La Crosse Ave that has operated at the community pool since 2000. It started under Julie and Chef Jaime Arevalo, changed hands in 2018 to Emily and Chef Tray Horvath of Primizie Catering, and has kept doing the same thing the whole time: pizza and burgers through a window with no indoor seating, ordered poolside on a hot afternoon. It is the one food option in the neighborhood that predates almost everything else on the current list, and it has outlasted several restaurant concepts that came and went in the same commercial centers.

The trail took over a decade to close its last gap. The pizza window at the pool has been open the whole time.

The parcel residents are already watching

Circle C's HOA does not typically generate headlines, but its board meetings are where residents first hear about changes before they show up anywhere else. At the April 30 board meeting, residents learned about the Stratus property, a parcel along MoPac between La Crosse Avenue and the Valor school, which holds full development rights under its existing agreement with the City of Austin. Nothing about that parcel has been finalized or announced beyond what the board discussed, and there is no timeline attached to it yet. It is worth knowing about mainly because it is the kind of thing residents will keep asking about at future meetings, and because it sits close enough to the same corridor where the restaurant rotation and the trail extension are both playing out.

None of this is a prediction about what happens to that land. It is simply what is on the board's radar right now, alongside everything else changing at the edges of the neighborhood this year.

What actually shifts this summer

Put together, none of these threads is really about Circle C getting bigger or busier. The trail extension does not add acreage to the neighborhood, it removes a stopping point that has defined how people use the trail system for years. The restaurant corridor keeps cycling through names the way it always has, with one 26-year-old pizza window as the fixed point. The Wednesday breakfast table at Waterloo keeps running regardless of any of it. And the HOA keeps tracking one more parcel along MoPac the way it tracks everything else that touches the neighborhood's edge.

If you live here and use the trail, the summer 2026 completion date is the one thing on this list actually worth marking on a calendar. Everything else is just what already happens, on schedule, whether anyone writes it down or not.

If you're weighing what a home near this stretch of the Violet Crown Trail is actually worth once that gap closes, or want a clearer read on how Circle C fits into the broader southwest Austin market, The Drewett Group can walk you through it.

Experience premium real estate service for a lifetime

With over 30 years of living in Austin, the Drewett family brings a deep understanding of the local market and community - an advantage that has been instrumental to their continued success in real estate.

Follow Us on Instagram